Deformation surveys |
One of the land survey projects concerned the monitoring of the vertical movement of the Galecopperbrug in Utrecht, the Netherlands. This 180 metres long bridge was designed to be flexible and undulates a few decimetres with an approximate 10 second period.
| |
|
In the summer of 2008 this bridge survey was executed non-stop over a period of three days, at a sub-second frequency, using four Leica total stations and in-house developed software. | |
|
|